Some projects done:
Hotel Flamenco Playa
Playa dorada, Puerto Plata
Hotel Bahía Príncipe
Rooms and Treatment Plant.
Gaspar Hernandez, Espaillat
Sosua Hills
Sosua, Puerto Plata
Hotel Bahía Príncipe
Bavaro
Plaza Comercial
Verón, Higuey
Edificio Banco del Progreso
Ave. Winston Churchill
Edificio Álvarez Sánchez
Hotel Bahía Príncipe
Ave. Luperon
Torre del Parque
Ave. Anacaona
Plaza Diamond Mall
Ave. Los Próceres
In execution
• Building remodeling: Dirección General de Impuestos Internos (DGII) 7 levels.
Empresa Cinco C, S.A
• Construction and electrification of 60,000 feet² Building of armed concrete.
Invesment: US$ 2,880,000. Complete civil work.
Casino Bavaro Princess
• Construction area 3,160mts²
Invesment: US$ 5 millions
Construction in the highway: Autovía del Este
• 4 distributors and 11 Km. of boulevard with re-return by automated aspersion system.
Hotel H-10 Odelpa
• Amphitheatre area.
• Lobby-restaurant area .
Hotel Sol de Plata
• Service area construction.
• Beach bar, lobby area and amphitheatre.
Ultrapasteurizadora Celia
• Construction and electrification of 2 industrial ships (similars) 2,800mts². San Cristobal, RD.
• Boiler house, four levels, electrical, filter area, 2 cisterns of 36,000 gal.
• Cistern 600,000 gals armed concrete. Plant house 600mts².
• Double industrial ship, double level, 500 mts².
• Ship 30x48 doble height for load, unload and freight elevator circulation in dock areas, San Cristobal.
Hotel Suite Grape
• Structure instalation for Glass roof. Cabarete, RD.
Residential Constructions
• 3 residence in Los Cacicazgos and 4 residence in Las Praderas.
Edificio Evertz Construction
• 8 levels building with 638 mts² by level for office and apartments. Av Rómulo Betancourt No. 549- Santo Domingo
Universidad Federico Henriquez Carvajal
• 2nd and 3r level construction area 1,140 mts² for classrooms. Av. Isabel Aguiar
Hotel Bahía del Principe
• Building constrution for kitchen, pastry and shopping department areas. 1,250mts².
• Laundry building constrution, boiler and maintenance area 1,200mts².
• Generation and transformers room construction 1,890 mts².
• Elevated Cistern 200,000 gals,
• 2.1 millions gallons pool, area 1,890 mts²
• Drainage system instalation and sidewalks, first avenue, project entrance with 48 parking slots of 1,100 mts x 8 mts width.
• Pueblo principe construction with 24 commercials premises, casinoa, nightclubs and restaurants.
• Access road construction of 4 km. lenght.
Antonio P. Hache
• P. Hache building constrution, 2 levels with double height. 1800mts². Calle Duarte, Santiago
Hotel Coral Beach Resort
• 8 buildings constrution in armed concrete and blocks. 12,000 mts². Sosua, Puerto Plata.
Hotel Sol de Plata
• Ship construction for service area.
• Metallic structure in beach Bar.
• Lobby area structure.
• Amphitheatre area structure.
Hotel Melia Santo Domingo
• Kitchen and laundr area rebuild.
American Sport
• 4 industrial ships construction and electrification and installation of 4 power plants of 350KV.
Autodromo Las Americas
• Grand Stand.
Centros de Convensiones
• Prestressed beams construction. Santiago, RD.
Manati Park
• Grand Stand construction. 900 m².
Hotel Iberostar Bávaro
• Amphitheatre area construction.
• Service area construction.
• Factory ship construction.
• 4 metallic structures installation for service area.
• Metallic ship structure 3000 m².
Aluminio Antillanos
• Ship constructions for aluminium fuse 1360 m².
Hotel Iberostar Dominicana
• Ship construction 6000 feet².
• Eaves installation 3000 feet².
Samsonite Suitcases Factory
• Construction 155,000 feet². (The biggest in the country).
Zona Franca el Gran Almirante
• 2 ships constructions of 7000 feet².
Zona Franca Hainamosa
• 2 ships constructions of 14000 feet².
Hotel Dominicus
• Amphitheatre construction. La Romana, RD.
Ferretería Bellon
• Structure and high crane installation.
Zona Franca Moca
• Industrial shipp 2nd level construction (Casa Hache).
Zona Franca de Bonao
• Elevated tank construction and electrical installation of 60,000 Gallons.
• Annexed construction of 11,000 feet².
Hotel Meliá Bavaro, Higuey
• Building construction and electrical installation of 18,600 feet² (Warehouse area and plant room).
• Service Building construction and electrical installation of 18,000 feet².
• High pressure tank construction and electrical installation of 2,000 gallons.
Laboratorio Alpha
• Building construction of 9,000 feet².
• Warehouse 2nd floor construction of 4100 feet²
Corporación de Zonas Francas
• 8 industrial ships construction.
• D.F. Inter. building construction
Zona Franca de la Vega
• Ship construction 10,000 feet²
Pelican Beach Resort Cabarete
• 8 levels building
Aeropuerto Maria montes Barahona Landscaping
Templo de Federacion familias por la paz mundial
• Santana building
Editorial El caribe (Annexed)
Casino Bavaro Princes
More than 50 important residences
Penthouse Ing. Taveras decoration
700 lots urbanization
• Las colinas Residential, Bani